Laborer on installation of running tracks.
3 - Key responsibility areas (by order of importance) % of time allocated
1.
Cleaning and preparation of asphalt/concrete surface to secure polyurethane track material
40
2.
Use of small hand tools and power equipment in surface preparation and polyurethane installation
20
3.
Carrying, mixing and pouring polyurethane to install track surface as required by OSHA safety standards.
10
4.
Recovery of excess rubber granules and edge detail trimming of track surface
20
5.
General site cleanup and demobilization
10
Competencies:
Quick study and able to meet physical demands
Technical qualifications or membership to a professional order:
6 - Significant Worksite Measurements:
Activities and the Duration
Occasionally 1 - 33%:
Jumping Climbing
Frequently 34 - 66%:
Sit: When using paver Stand Walk Stoop/Bend Push/Pull Squat Crawl/Kneel Reach Above Shoulder Forearm Rotation Climb
Constantly 67 - 100%:
Twist/Turn Repetitive hand/wrist:
7 - Critical Demands (Heavy):
Material Handling: 34 - 66% of the time